Suche
Hot Suchwörter:
series DNE Mechanical C-Bend
Startseite·Service & Support·Kundenfall·Cleaning equipment
Pottery machine equipment
Keda Equipment
After the upgrade, the per capita output value is 3 times that of the previous one; in the past, the delivery cycle of a production line was about 45 days, but after the upgrade, the delivery cycle was reduced to 25 days
Overview

Asia's No. 1 and No. 2 Global Ceramic Machinery Equipment Enterprise

Capacity upgrade (transformation to a service provider for the production of complete ceramic plants)

  • 1992Jahr

    Gegründet

  • 1500+

    Mitarbeiter

  • 266666.7+

    Gebiet

02科达装备-a.png

Geschäftsbereich

  • Pottery machine equipment
  • Building materials machinery
  • New energy equipment

DNE LASER Lösung

  • 3x D-Soar 1530FCCBD 6kW
  • 3x D-Trans 3015
  • 1x D-Tube-38120 6kW
  • Large row storage (double row/11 columns/9 floors/184 storage positions)
  • Plant Manager
  • ERP Integration
niu_icon01.png
Anfordern Sie ein Angebot
Name*
E-Mail-Adresse*
Telefon oder WhatsApp*
Land*
Stadt
Unternehmen
Schneidmaterial
Maschinenart
Nachricht
Jetzt einreichen
Vielen Dank!
Vielen Dank für Ihre Aufmerksamkeit. Wir werden uns so schnell wie möglich mit Ihnen in Verbindung setzen.
Bestätigen
Bestätigen
Produktliste
Informationen einreichen
Jetzt einreichen